Installation of pre-cast external wall panels at 130 Parry St Newcastle.
Due to the height of these panels, one crane was required to lift and a second crane required to spin the panel. The use of two cranes in tandem is known as a “multi-crane lift” and requires the use of a load spreader (or equaliser beam) and expert level crane drivers.